The particular operation measure that cut of numerical control line machines

  • Time:
  • Click:106
The operation prepares (1) the mains switch that start, let machine tool empty running, observe whether its job status is normal. (2) machine requirement oiling by the machine tool; Add or change working fluid, general every other it is advisable that 10 ~ change 15 days; Whether does the decision exchange electrode silk. (3) adjust line wearing, choose corresponding cut span according to the ply of workpiece. (4) corrective electrode silk and clamping apparatus are perpendicular. Operation measure (1) switch on the mobile phone. (2) workpiece holds clip. (3) fixed position. This pace is used at workpiece to the circumstance that fixed position asks falls only. (4) process designing and machine program send console. (5) parameter of affirmatory pulse power source (when should needing to adjust parameter, must close high frequency pulse to output first) . (6) electric machinery of silk of the carry that start, pump of fluid of the job that start. (7) will control ark park of high frequency pulse " ON " condition. (8) the hand shakes workbench handle, make electrode silk and workpiece adjacent till occurrence scintilla (when already undertaking locating operating, this pace must omit) . (9) press " Enter " (carriage return) key, begin to execute an order, undertake machining. (10) electric machinery of working fluid pump should be shut first after treatment ends, shut carry silk electric machinery next, whether does coordinate of examination X, Y arrive terminal. Arrive to next workpiece are torn open to clean when terminus and check quality; Did not arrive when terminus should check an order whether wrong or console has deny fault. Note: The machine tool operates box and control ark have red to stop switch urgently on Control Panel, in the job if have accident case, press this switch can cut off the power stop machine. CNC Milling